Since 1970, a success story achieved as a result of the high quality and expertise of our people

ON going projects

Pavimental is currently working on the expansion of over 130 km of carriageway on the A/9 (Lainate – Como - Chiasso), on the A/14 (the North Rimini – Cattolica; Fano – Senigallia and North Rimini - Pedaso sections) and on the A/1 (Barberino di Mugello - Incisa Valdarno and North Florence- South Florence sections). Works are also underway to build or replace safety and noise barriers along numerous sections of the motorway network. Pavimental is also starting work on the construction of interchanges Genova San Benigno, Crespellano and industrial area of Foggia and those related to Rho-Monza. The total amount of the works exceeds EUR 1,350 million. Leggi altro

Enhancement of the Freight Terminal at Naples…

Enhancement of the Freight Terminal at Naples Capodichino airport    Start of works: 25/06/2019 End of works as per the contract: 19/04/2020 Value of the works:€ 5,427,045.62       In overall terms, the…

Rebuilding of the viaduct connecting the A1…

The rebuilding of the Lepido viaduct at Borgo Panigale completed in only 53 days.  The works, which started the day after the collapse of a span of the overpass caused by an accident in which a tanker exploded, were initially expected to take 5…

Lot 2 - Santa Lucia Tunnel A1 - Expansion to…

The project for the Barberino di Mugello – Incisa Valdarno expansion to three lanes, in the Barberino di Mugello – Florence North stretch, covers from marker 261+503 (corresponding to the Barberino di Mugello exit) and marker 279+000…

Highway A4 Turin-Venice – Expansion to four…

Highway A4 Turin-Venice – Expansion to four lanes of the highway stretch between the exit for Viale Certosa and the exit for Sesto San Giovanni Project value: € 116 million Start of works: 16 January 2016    Main…

Fiumicino Airport – East HUB Terminal…

FIUMICINO AIRPORT – EAST HUB TERMINAL SYSTEM – LOT 1   WORKS FOR THE COMPLETION OF THE LAND SIDE AND AIR SIDE INFRASTRUCTURES OF THE TERMINAL SUB-SYSTEM   Start of works: 02.10.2017 End of works: 17.09.2020 Value of…

Via della Superba - Genoa

Road reserved for heavy vehicles heading to the port of Genoa opened on 19 September 2018   Length: 3.7 km Duration of the work: 27 consecutive days (22 August to 18 September 2018) Workforce used: 50 resources Quantity of bituminous…

Compensatory works Municipality of Fano

Interventions for the period March 2017 - July 2019 1- LINK ROAD SP3 - VIA CAMPANELLA The project establishes the connection between (Paved Road) SP3 Flaminia and via Tommaso Campanella, the main local road network. The link road is composed…

Barberino di Mugello – Firenze Incisa…

Project value: 223.454.548,18 Euros End of works (as per contract): 2018, November Start of works: 2014, May 22nd Expected duration of works: 1.643 days   Earth movements: 1.979.315,29 M3 Sub-foundations: 8.961,83 M3 - 7.436,00…

A1 MILAN – NAPLES MOTORWAY WORKS ON…

Project value: Euro 31,010,798.86     Earth movements: 231,052 m3   Sub-foundations: 47,308 m3   Concrete: 13,487 m3   Asphalt road surface: 47,308 TONNES   Draining pavement: 13,505…

A1 Milan – Naples. Construction of the…

The project constitutes a small part of the construction of the third lane of the A1 Milan – Naples motorway, on the stretch from Florence South to Incisa. The construction project is aimed at bringing the existing infrastructure to a…

Certifications

Pavimental considers Safety, Environment and Quality to be strategic factors that also provide a competitive edge. The key role assigned to these three areas takes the form of a continuous commitment to search for new eco-compatible materials and develop technologies for the recovery and reuse of products used, on the one hand, and, on the other, the certification of all aspects relating to its business, which are often one step ahead of and go well beyond simply compliance with legal obligations. Leggi altro